Improper connection 2 Aug 2012
Improper connection Contractor deviated from the plans by installing a second sill plate ("double-sill"). While uplift loads can still be accommodated, the contractor failed to provide resistance for to sliding. The foundation was backfilled prior to the installation of bracing or the deck, a violation.
foundation wind
Improper connection Gallery: Gallery Description: Contractor deviated from the plans by installing a second sill plate ("double-sill"). While uplift loads can still be accommodated, the contractor failed to provide resistance for to sliding. The foundation was backfilled prior to the installation of bracing or the deck, a violation.